ADVERTISEMENT

CU building new video board on south end of Folsom

Nikkieds

Buff All-American
Gold Member
Jul 19, 2022
2,665
4,724
113
Here’s a look at the transformation:



Per the release:

The Colorado Buffaloes will begin construction on a new video board on the south end of Folsom Field that will be ready for the 2024 season, CU Athletic Director Rick George announced Wednesday.
The new board will be more than five times the surface area of the old board. The ribbon board below the video board will also be significantly expanded, stretching from the north end of the club level on the east side around the bowl to Balch Fieldhouse on the southwest side, over 1,000 feet from the top of section 203 to the top of section 220.
“Enhancing the atmosphere of Folsom Field on game day is always a top priority and we are always looking for ways to improve,” CU Athletic Director Rick George said. “I’m confident this new video board will further enrich and elevate the game day experience for our fans next year in our first season in the Big 12 Conference.”
The new board will measure 130 feet wide by 36 feet high, eight feet taller than the current board and 98 feet wider, or about the same width of the current ribbon board under the current video board, which measures 32 feet by 28 feet.
 
ADVERTISEMENT

Latest posts

ADVERTISEMENT

Go Big.
Get Premium.

Join Rivals to access this premium section.

  • Say your piece in exclusive fan communities.
  • Unlock Premium news from the largest network of experts.
  • Dominate with stats, athlete data, Rivals250 rankings, and more.
Log in or subscribe today Go Back